最新亚洲人成网站在线观看_久久棈精品久久久久久噜噜_狠狠色综合久色AⅤ一区站长工具_日本三级无码中文字幕DVD

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator nitrogen filling vehicle operation steps

未標(biāo)題-1.jpg

  

Operation steps of the accumulator nitrogen filling vehicle:

The first step: first open the control box three-wire power supply (380V);

Step 2: Open the unloading valve (position reference manual) on the hydraulic module of the pump station until the system oil pressure drops to 0 MPa (ie, the pressure gauge shows 0);

Step 3: Open the top cover of the accumulator, then unscrew the black cap inside, and rotate the handle of the nitrogen-filled special tool to the maximum position (counterclockwise to the maximum), connect the accumulator, and press the special tool handle. Rotate clockwise. When you hear the sound coming out of the gas, observe the pressure gauge on the tool. The pressure display value is the pressure of the accumulator. At this time, turn it counterclockwise to the maximum and remove the special tool.

When the pressure is less than 5 MPa, it is necessary to flush the accumulator. The above is the detection process.


保定市| 彭州市| 许昌市| 贵南县| 隆回县| 扶风县| 东宁县| 岐山县| 珲春市| 麻栗坡县| 柏乡县| 辽阳县| 东阳市| 普兰店市| 丽水市| 海伦市| 新闻| 屏东县| 岑巩县| 苍溪县| 池州市| 达尔| 新乡县| 五家渠市| 武穴市| 台南县| 婺源县| 民丰县| 满洲里市| 当雄县| 峡江县| 屏山县| 谢通门县| 抚远县| 垫江县| 勐海县| 阿荣旗| 海林市| 临清市| 钦州市| 项城市|